Close Menu
tisitwas.comtisitwas.com
  • Home
  • Breakups
  • Conflicts
  • Dating Tips
  • Marriage
  • Romance
  • Self-Love
  • Toxic Signs

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Bengal CID questions TMC MLAs over their signatures on LoP letter

May 30, 2026

Blind date: ‘Most awkward moment? When he said his dad set up the date for him’ | Dating

May 30, 2026

Woman teacher dies after falling from moving bus in Sitapur

May 30, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
tisitwas.comtisitwas.com
  • Home
  • Breakups
  • Conflicts
  • Dating Tips
  • Marriage
  • Romance
  • Self-Love
  • Toxic Signs
tisitwas.comtisitwas.com
Home»Romance»Cidco pushes ahead with two coastal roads to boost NMIA access
Romance

Cidco pushes ahead with two coastal roads to boost NMIA access

kirklandc008@gmail.comBy kirklandc008@gmail.comNovember 16, 2025No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
Cidco pushes ahead with two coastal roads to boost NMIA access
Share
Facebook Twitter LinkedIn WhatsApp Pinterest Email

Navi Mumbai: After Mumbai, the satellite city of Navi Mumbai is set to get its own coastal roads. The City and Industrial Development Corporation of Maharashtra (Cidco) is pushing ahead with the Kharghar–CBD Belapur Coastal Road and the Ulwe Coastal Road, both designed to provide seamless connectivity to the upcoming Navi Mumbai International Airport (NMIA) and decongest the region’s busiest corridors, officials said.

The Ulwe Coastal Road will provide seamless connectivity from Atal Setu to NMIA. (HT Archives) (Hindustan Times)
The Ulwe Coastal Road will provide seamless connectivity from Atal Setu to NMIA. (HT Archives) (Hindustan Times)

Kharghar–CBD Belapur Coastal Road

Estimated to cost ₹1,020.7 crore, the Kharghar-CBD Belapur Coastal Road is expected to halve travel time between the two suburbs from the current 30-40 minutes during peak hours. The corridor will be 30 metres wide and 9.678 km long, out of which 6.96km will be newly developed, and existing roads will be used for the rest.

The alignment of the road begins at Jalmarg in Sector 16, Kharghar, passes Kharghar railway station and ends near DPS Nerul, with a link to Palm Beach Road. An interchange over the Sion–Panvel Expressway will provide seamless access to NMIA and significantly ease pressure on Navi Mumbai’s busiest arterial road, officials said.

The project has received all the necessary clearances from the state forest department and the Maharashtra Coastal Zone Management Authority (MCZMA), Cidco officials said. The construction is expected to start in early 2026 and is targeted for completion by the end of 2028.

“This is not just an airport connector,” said Cidco vice chairman and managing director Vijay Singhal. “It is a backbone project that will integrate multiple growth nodes — from the corporate park to housing clusters — while easing pressure on the Sion–Panvel Highway.”

Cidco expects the corridor to support key upcoming developments, including the International Corporate Park, the Kharghar Valley Golf Course and the FIFA-standard Centre of Excellence. The project complements the Ulwe Coastal Road, which will connect NMIA directly to the Atal Setu.

Initially, the Kharghar-CBD Belapur Coastal Road was proposed to pass along the Panvel creek. As it passed through the green belt around Belapur mangrove forest next to Panvel creek, the alignment was altered to divert the coastal road to be an inland road into certain sectors in Belapur. However, the revised alignment was opposed by residents of Belapur sectors 11 and 15, who argue that the route now cuts through jogging tracks, green zones, and residential belts. Residents have raised concerns about traffic bottlenecks near NRI DPS School and the potential loss of tree cover that has been nurtured over decades.

Singhal, however, stated that the green belt will be preserved, and traffic management plans will be implemented. Cidco will undertake compensatory afforestation to offset the impact on 8.22 hectares of mangroves, he added.

Ulwe Coastal Road

Meanwhile, work on the six-lane, seven-kilometre-long Ulwe Coastal Road has reached the 60% mark. Cidco aims to finish the project by the end of 2026, in sync with NMIA’s operational timeline.

Developed at a cost of ₹1,600 crore, the project includes a 5.8km coastal section and a 903-metre elevated Airport Link Road (ALR), providing direct and traffic signal-free access from the Atal Setu to NMIA. A large portion of the road is being built on stilts to protect mangroves, said an official.

The corridor will bypass Amra Marg and NH-348, reducing travel time from south Mumbai to NMIA by up to 25 minutes, officials said. It will also strengthen connectivity to Jawaharlal Nehru Port Authority (JNPA) and the Navi Mumbai Special Economic Zone, boosting regional logistics and business access.

“The Ulwe Coastal Road will enhance Navi Mumbai’s transport network and accelerate national economic growth,” said Singhal.

access Ahead Boost Cidco coastal NMIA pushes roads
Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
kirklandc008@gmail.com
  • Website

Related Posts

Bengal CID questions TMC MLAs over their signatures on LoP letter

May 30, 2026

Woman teacher dies after falling from moving bus in Sitapur

May 30, 2026

Block education officer shunted for directing schools to collect cattle fodder in UP’s Bareilly

May 29, 2026

Seven people killed as lightning, thunderstorms hit south Bengal districts

May 29, 2026

AAP sweeps Punjab civic polls, wins over 690 wards, counting underway

May 29, 2026

Bengal leather industry expecting raw material shortage amid strict slaughter norms

May 29, 2026
Add A Comment
Leave A Reply Cancel Reply

Don't Miss

Bengal CID questions TMC MLAs over their signatures on LoP letter

By kirklandc008@gmail.comMay 30, 2026

The Criminal Investigation Department (CID) of the West Bengal Police on Friday questioned several Trinamool…

Blind date: ‘Most awkward moment? When he said his dad set up the date for him’ | Dating

May 30, 2026

Woman teacher dies after falling from moving bus in Sitapur

May 30, 2026

Block education officer shunted for directing schools to collect cattle fodder in UP’s Bareilly

May 29, 2026
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Bengal CID questions TMC MLAs over their signatures on LoP letter

May 30, 2026

Blind date: ‘Most awkward moment? When he said his dad set up the date for him’ | Dating

May 30, 2026

Woman teacher dies after falling from moving bus in Sitapur

May 30, 2026

Block education officer shunted for directing schools to collect cattle fodder in UP’s Bareilly

May 29, 2026

Subscribe to Updates

Get the latest creative news from SmartMag about art & design.

About Us

Welcome to tisitwas, your trusted space for honest, heartfelt, and empowering relationship advice. Whether you're healing from a breakup, dealing with arguments, or searching for the one, we're here to walk with you every step of the way.

Our Picks

Bengal CID questions TMC MLAs over their signatures on LoP letter

May 30, 2026

Blind date: ‘Most awkward moment? When he said his dad set up the date for him’ | Dating

May 30, 2026
Recent Posts
  • Bengal CID questions TMC MLAs over their signatures on LoP letter
  • Blind date: ‘Most awkward moment? When he said his dad set up the date for him’ | Dating
  • Woman teacher dies after falling from moving bus in Sitapur
Facebook X (Twitter) Instagram Pinterest
  • About Us
  • Get In Touch
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions
© 2026 [Websie]. Designed by Pro.

Type above and press Enter to search. Press Esc to cancel.